pictures from today! May-22

  • This is called the spine at the womens college, it connects the major colleges together. Its purpose is to provide protection from the sun.

  •  We thought this was just a cool picture to take, describing what the workers need to have on site with them.
 a dental chair inside the lab mockup room. There are over 500 labs at on the campus. They do mockups to make sure that the room is to the owners specifications before they make more of them. This can save the contractor the head ake of redoing several labs.

Love this sign!
A Tour of a lab getting the finishing touches.



The entry of one of the research buildings


THE FINANCIAL DISTRICT!

There are 40 or so buildings being built at once! 

An I.T. room


Our dinner tonight

Monday, May 21, 2012

Our First Week!

Tim Here-

Yesterday Trace Gregg gave us a tour of KSU and explained the project from a mechanical perspective. I have to admit, I don't know much about the mechanical systems, but Trace did a great job helping me understand it.

I never realized how much careful planning and detail a building requires, and I am starting to appreciate the amount of expertise there is in the FTR Office. The team that FTR International Inc. of Nevada has put together has an excellent mixture of skills, knowledge, and backgrounds. The opportunity to be here is truly a blessing, and I am very grateful that FTR's personnel have taken time out of their busy days to teach us everything they know.

Here are some pictures from our first week here in Saudi Arabia...












Just Pictures Today

I thought that posting some photos today would be refreshing change of pace versus a lengthy post.




The boiler room. Believe it or not, but it actually gets below 40 degrees in Saudi Arabia




Trace Gregg educating the group about the central cooling and pumping plant.

More cooling towers in one spot than I've seen in my entire  life!






Day 8

Today Jim gave us an overview of the mechanical system being used at KSU, which was quite intricate to say the least.  After explaining the heating and cooling systems in place, Trace gave us a tour of the central plant and showed us everything we had just seen on the plans.  Seeing it both in person and on plans helped it register in my brain alot better.  In the afternoon we were given a tutourial on BIM and how it's being integrated into this project. We also went to building 26, which is where the auditorium is, and Vidos gave us a short call on acustics and explained the design of the auditorium to us.  We cap off the day with a short, but very exciting, meeting with Engineer Nawaf.

Monday madness

Monday, May 21 Today feels like I am sprinting just to keep up with the pace. It's  only 3:30 here in Saudi but I am beat tired. Let me give you a debriefing.  My day began by trying to shave my beard with a razor blade, it was like trying to run a push mower through foot tall grass. But the mission was accomplished! Our next mission was getting to the conference room on time. Everything was going well until it was 7:30 am and we realized Nazir was still sleeping! But he was ready in a flash and we arrived on time for our first session at 8 am.  We reviewed our MEP (mechanical, electrical, plumbing) knowledge and studied the main power plant facility of the girls campus. Then we  headed out for a job site tour of the power plant. I would like to thank Trace Gregg for the tour; his knowledge on MEP is amazing. Also, I would like to thank Jim  Mistry who led the lecture sessions. He led the MEP review and the commissioner review.  After lunch Henry Cabansag showed us how he is using BIM to coordinate MEP in a building on site. As much as I love 3D modeling, I have much to learn. Thanks Henry!  Our last session was with Vidas Juzenas. He gave us a tour of the auditorium explaining the engineering behind acoustic paneling and how to use them to achieve a desired comfort.  We have a couple more sessions with Vidas and I am looking forward to hearing from him again. Thanks Vidas!  Tonight we have something really exciting planned but I will update everyone on that tomorrow. Thanks for reading!

Sunday, May 20, 2012

Today we went on a tour of the science labs led by Max Mejia (pardon my improper spelling of Maxs' last name in my previous post) and Todd Enninga. Being able to gain a new perspective of a jobsite through the eyes of these two extremely knowledge professionals gave the team and I a lot of useful information that we will be able to apply to our time in industry and in the classroom.  Jamie Moffat's presentation on heat safety helped us to gain knowledge on how to combat the ill effects of the extreme heat here in Riyadh. This presentation will go a long way in keeping the team and I safe once the 120 degree temperature hits.  I also sincerely appreciate the insight Mike Rodgers gave us on QA/QC and the steps FTR International of Nevada takes to ensure that the KSU Girls campus is built to the highest of standards. Nazir took us to an amazing shawerma restaurant for dinner tonight. We all ate so much that it was hard to walk to the car once we were finished! Tomorrow we have more jobsite tours set up so its time to hydrate.

Jobsite Video!

Tim Here-

Here's a short little video filmed during one of our jobsite tours. Special thanks to Bill Koscovich and Max Mejia for helping us understand everything that was going on!