The scuba diving yesterday was amazing, it was unlike anything I've ever experienced.  The water was crystal clear and the there were loads of colorful fish that are unlike anything in Indiana.  Today we went on a site walk of KSU with Max and Bill to 3 different buildings, specifically 5, 26, and 28, all of which were at different stages of construction.  Building 26, which is the auditorium, is nearly complete; Building 28 was about halfway done, and Building 5 still had quite a bit to go.  We walked through the tunnel between a couple of the buildings, which follows what they call the spine.  Walking the site really gives you an appreciation of how large the project is. In the afternoon we were taught, in some detail, about shop drawings  and differences in installation procedures in this region of the world.  The methodology may not be the same as what I'm used to, but the end product is an exact copy. Now were off to meet with Katie who have graciously invited us to a BBQ.